Tuesday, October 4, 2011

Volt, Prius or CRV? Numbers Make the Choice Obvious.

The fully worded question is: How does the extended-range GM Volt Electric Vehicle compare with Toyota’s fourth generation hybrid Prius and Honda’s popular compact SUV the CRV?

I was not inclined to immediately dismiss the GM Volt as an expensive failure, (e.g., Chevy Volt is Automotive Version of Solyndra) and the October 2011 issue of Consumer Reports (CR) encouraged me to look into this different car.

Although CR did not award the Volt its coveted Recommended status, some of its critique is excellent for a compact car with unconventional technology:
  • “Responsive steering makes the Volt feel fairly nimble in turns.”
  • “The Volt was secure at its handling limits.”
  • “The ride feels solid and firm yet compliant.”
  • “Braking distance was very good overall.” And this one:
  • “The Volt is amazingly inexpensive to run on short trips.”
The last one has twice the significance for Honolulu. Because of the compactness of the land, we make many more short trips in Honolulu than motorists in spread out mainland cities with about one million population. But our electricity cost is roughly three times higher than mainland US.

Does a Volt make a good choice? We can arrive at an answer by comparing it to two popular choices in Honolulu like the Toyota Prius and the Honda CRV. (1)

CR compared their $43,000 Volt to a $26,500 Toyota Prius and a $18,500 Hyundai Elantra. It excluded the purchase cost. Based on gasoline and kilowatt-hour costs, CR found that Volt is cheapest for 30 mile trips, is similar to hybrids for 70 mile trips, and loses its advantage as trips get longer.

To get to a better answer I used both Honolulu and US mainland prices for fuel and electricity, 30 mile and 70 mile trips, an 8 year/100,000 mile horizon (that’s when Volt's battery warranty expires), US and Hawaii tax incentives, and resale value at the end of 8 years. One component that remains uncertain in these half life-cycle cost estimations is maintenance.

In 8 years, Prius and CRV will make extensive use of their internal combustion engine. They would need about 20 oil changes and a few component replacements which should cost $1,000 to $2,000. Also both of them may require transmission repairs which are not applicable to the Volt. Both Volt and Prius have regenerative braking so they may not need brake pads before 100,000 miles but the CRV will likely need two sets of front brake pads and rotor resurfacing. Brake costs for the CRV for 8 years and 100,000 miles may come close to $1,000. Maintenance and repairs play a role in life cycle cost.

Insurance, finance charges, license, annual registration and safety inspections were not included because they are similar for all three cars for the same driver at a given location, e.g., registration and insurance rates vary widely by state. (As of this writing I am not certain that Volt is subject to Smog Test where applicable.) These costs do not affect the bottom line choice.

Discounted parking and other perks for EVs were not included. Currently EV perks in Hawaii are as follows:
  • Special electric vehicle license plates.
  • Free parking at State and County facilities including meters.
  • Free parking at UH parking structure.
  • Exemptions from high occupancy vehicle lanes.
For some users these perks may amount to more than $1,000 per year, at taxpayer expense (e.g., a stall occupied by an EV cannot be occupied by a fee-paying vehicle, so EV user gains amount X and taxpayer loses parking revenue X.)

A big unknown is the durability and replacement cost of Volt's battery. GM's warranty is for 8 years and 100,000 miles. Note that California requires 10 years/150,000 miles. As a result, Volt buyers will not receive California's $5,000 incentive. This limitation is not applicable to Hawaii.

The Prius' entire hybrid system (which includes the hybrid battery pack) is warranted for 8 years/100,000 miles. A battery replacement with a new one at a dealership costs roughly $4,000. There are lower cost options such as Re-Involt Technologies in North Carolina: “...batteries for the Prius 2001-2010 are $1675.00 plus shipping and your old battery.”

The table above details my estimates for the usage of these three cars in Honolulu using monthly gasoline prices and my own electricity bills to determine the actual bottom line cost of HECO’s price to the household. This price was then reduced by 6 cents, a discount that HECO offers if the EV is charged at home overnight. I assumed that this preferential treatment will last for the 8 year horizon in my analysis. HECO installation of a appropriate meter, purchase and installation of a 240V charger add over $2,500. There is a $750 incentive for the 240V charger.

Despite Honolulu’s expensive electricity, use of the Volt exclusively for short trips is much cheaper than its competitors. Honolulu Volt owner’s running cost comes to $595; the same cost at an average U.S. mainland city is $283.

Then I used a mix of 5 trips of 30 miles each and 2 trips of 70 miles each, per week, to arrive at my bottom line estimates. With such usage, the Volt, Prius and CRV will cost $1,150, $992 and $2,044, respectively, to run for 12,500 miles per year in Honolulu, and $698, $843 and $1,738, respectively, to run for 12,500 miles per year at an average mainland city.

Volt is the cheapest to operate on short and medium trips on the mainland, and Prius is the cheapest to operate on short and medium trips in Honolulu; about $150 cheaper than the Volt and more than $1,000 cheaper than the CRV. HECO’s high price per kilowatt-hour takes a toll on Volt.

Using Edmunds.com’s True Market Value(2), a flat documentation fee, 4.5% tax (GET in Hawaii, 8% sales tax on mainland) and applicable incentives, I arrived at the following cost estimates:

CRV has a purchase price of about $26,000 and Prius is about $29,500. Volt is $31,500 after $7,500 in federal incentives and $4,500 in Hawaii incentives have been deducted. These prices include destination charges and regional adjustments of about $750 (an add-on to car cost in Hawaii.) Due to lower state incentives and higher sales taxes, the Volt is about $3,000 more expensive on the US mainland. The other two are about the same as in Hawaii.

The bottom half of the table above is the bottom line. I arrived there by estimating today’s resale value of the three vehicles for 8 years in the future, using Edmunds.com. Both CRV and Prius have an over 10 year history on the market so their used car value is reliable. There are no estimates for the year-old Volt, so I assumed that it will have a resale value equal to the Prius.

Bottom line is that in Honolulu over 8 years and 100,000 miles the CRV will have a total cost of $33,775, the Prius will cost $27,888 and Volt comes in the middle with a total cost of $31,080. Mainland estimates are in the same order with only the CRV costing about $1,500 less than Hawaii due to the cheaper gasoline price.

With analysis like this, one can run “what if” scenarios quickly. What if average gasoline price for the next 8 years increases by a whopping 50% over the 18-month average I used? This would take Honolulu’s average gas price to $5.43 per gallon. In this case, the bottom line for the three cars will be as follows: the CRV will have a total cost of $41,963, the Prius will cost $31,861 and Volt would come in the middle at $32,589 (... plus registration, insurance, maintenance, parking and other applicable fees ... and the charger for the Volt.)

But over 75% of Oahu’s electricity comes from oil and this is not likely to change by much in the next 8 years. So if gasoline goes up by 50%, then electricity will go up by at least 30%. This increases Volt’s bottom line cost to $34,394. So even with very expensive gasoline Prius is cheaper than the Volt by $2,500.

All estimates indicate that Volt is a losing proposition to its buyer and it is certainly a losing proposition to the taxpayer because tax incentives of $12,000 are involved in the sale of every Volt in Hawaii. A Volt buyer could have gotten a much lower priced hybrid car and $12,000 of taxpayer monies could have gone to far more worthy causes. Parking incentives and the tax credit for the home charger may also add several thousand dollars of taxpayer subsidies.

Even the most extreme of “green” advocates cannot argue that the environmental benefits of each Volt over a Prius are worth $10,000 to $20,000 depending on location and taxpayer subsidized perks.

The Volt is a huge “miss” for GM, a manufacturer that could least afford a costly “miss,” and the total financial blunder from this vehicle is attributable to misguided policies (of the familiar liberal type.) Billions more will be spent on mandated EV chargers at parking lots, and on government fleet purchases of Volts.

Postcripts: (1) What about the all electric Nissan Leaf? Look for my updated coverage that will include the Leaf once reliable data become available, most likely early next year. (2) Edmunds.com is a reliable publication that I also used in my doctorate dissertation to determine car values in the late 1980s. It includes a “True Cost to Own” estimator that takes into account most of the life-cycle categories mentioned in my article. It has no estimates for Leaf and Volt.

Monday, October 3, 2011

Where Are the Rail Construction Crews?

Gone racing!

A friend sent me several pictures and this note: "I was stuck in traffic for almost an hour at 12 noon in Waipahu on Farrington Highway on Friday going to lunch and back with the staff. Took a picture of the construction area -- not a soul was there. What a charade."



I have already covered the effects of debilitating construction that will be caused by the rail project. What we are observing now is pre-construction for soils testing and relocation of utilities. The nightmare will begin once elevated construction begins. But where are the crews?

As I said, gone racing. See for yourself:

Sunday, October 2, 2011

News Behind the News: Honolulu Rail on the Ropes

An update of the Honolulu Rail Project, and the Rail Lawsuit by UH professors Randy Roth (Law School) and Panos Prevedouros (College of Engineering.)

Friday, September 30, 2011

Rail Construction Delays Will Take Decades to Counterbalance

One thing that the public has not understood and the City has never explained or quantified is this: The impact of construction on daily traffic flow for 6 to 12 years.


Let's say that all attempts to stop the proposed heavy rail for Honolulu fail and the rail as shown in the picture above is going to full implementation. There will be 21 approximately football sized stations 40 ft. or higher in the air.

This will require extensive lane closures and in make cases long term full road closures. In addition to the stations there will be 20 miles of guideways in the middle of major arterial streets such as Farrington Hwy., Kam Hwy., Dillingham Blvd., Queen St. Their traffic will have to divert to other (already congested) parallel roads. Congestion will be paralyzing for a decade.


The congestion due to rail construction will be so bad in total, that rail's tiny traffic relief after it opens won't balance it out for over 50 years.

Let's work out a quick and rough estimate.
  • Call "A" the amount of traffic congestion today from the general Ewa/Makakilo/Kapolei area to town.
  • Say rail will take 10 years to be built and congestion on that corridor will be 50% worse on the average. So rail will make 5A of additional congestion.
  • Now let's say that rail will reduce congestion by a (very large) 10%, so every year thereafter rail will be saving the same folks 0.1A of congestion. (The real traffic congestion reduction will be 2% to 5% at best.)
  • How many years will it take to balance the additional 5A of congestion they suffered while rail was built?
  • 5A divided by 0.1A gives 50
  • 50 years
  • Two generations with zero benefit.
As I have mentioned to folks in Kapolei: The best day for their to Honolulu ... was yesterday. Rail or not, congestion will get worse. (That is, until real congestion solutions are implemented.)

Monday, September 19, 2011

Jade Moon Wants Louder Support for Her Train to Ruin

Jade used her MidWeek column, plenty of emotion and wrong information to paint a favorable picture for Honolulu’s proposed elevated rail which she wants and supports. (Read it here.)

Jade issued a call to action because the pro-railers are not being heard. “I think it’s time for rail supporters to come back out and make a little noise. Make yourselves heard again.”

At the same time, the City shamelessly uses tax monies to produce, print and mail hundreds of thousands of gloss fliers to households monthly, it produces TV programs including a regular spot on O’lelo, it gives rail propaganda shows with food and music at high schools and colleges, and Inouye, mayor or HART have at least one press release or pro-rail event every week.

Moreover, the Star-Advertiser routinely rejects anti-rail letters and MidWeek has refused my multiple offers to print my articles. Councilman Tom Berg is being shadowed by Go-Rail-Go every time he arranges a townhall meeting with rail on the agenda. Pro-rail unions flooded the Land Use Commission hearings on Ho’opili recently. But none of this is enough for Jade. She wants to make sure that anti-rail voices are swamped.

“Our future demands that we protect our environment, that we have viable transportation choices. Clean mass transit must be one of the options on the menu” she claims.

The energy required just to build the foundations, columns, structures and trains involved is enough to give an energy consumption and pollution stroke to anyone willing to quantify it. National statistics clearly show that hybrid cars are less energy demanding and polluting than heavy rail, and 4-cylinder cars are not far behind the hybrids. That’s by mainland standards which include substantial nuclear and hydro (clean) power and less than 3% oil. In contrast, over 90% of Oahu’s electricity comes from oil with little end in sight. It is the dirtiest electricity in the U.S.

Remember that a parked car does not pollute. A train runs less than half full most the time. Plus station lights, elevators, escalators, ticket machines, controllers, air-conditioners are on all the time. What a waste of resources!

Here is a green transportation alternative for Jade: Telecommuting. Since the turn of the millennium, more Americans telecommute than take trains. Also two years before the 2008 “rail referendum” on Oahu there was another one about bikeways and a whopping 72% were in favor. What did Mufi I (Hannemann) and Mufi II (Carlisle) do about bikeways? Where is Jade’s outrage for this green mode? Perhaps bikes are ignored because they aren’t HECO customers.

“It would revitalize the construction industry…” No, it’ll keep some of them busy for a few years. Then what? Megaprojects are not sustainable. All they do is create “bubbles” of temporary growth. This point is too myopic to discuss any further.

“…stimulate business and economic development and provide opportunities for employment.” Maybe, but correctly spent, six billion dollars can go way further for Oahu. Here is a suggestion: A $6 Billion Plan for Hawaii's Long-term Prosperity.

“Listen to the voices of the people who are tired of traffic hell.” I’d agree that by local standards the Kapolei to town commute is what Jade calls “traffic hell.” But Oahu’s congestion ranking is between 49 and 52 worse in the US according to the Texas Transportation Institute congestion index estimations: Mobility Data for Honolulu (2004 to 2009.)

“My biggest fear for rail is that it will somehow stumble into a legal no man’s land.” Jade got this right. Even if the Cayetano, et al. suit fails, even if the Bombardier complaints fail, there will be dozens of eminent domain and other suits. Big projects typically get stuck. One heiau in Halawa did it for H-3 Freeway. How’s several football field sized stations in Waipahu, Kalihi, Kakaako 40 ft. up in the air?

Rail for Oahu has been, is and will be a losing proposition. Manini traffic relief, huge visual and environmental impact, colossal cost to implement, and ridiculous traffic and court tie-ups once real construction begins.

Wednesday, September 14, 2011

Hawaii Solar Technology Choice

Q: Will the consumer gain or lose?
A: Lose big if a proposal gets approval

The technology battle is between Concentrated Solar Panel (CSP) and Photo-voltaic (PV). Here are the facts:

Why should Hawaii pay more for electricity generated from CSP than it does from PV? Hawaii’s leaders have proposed that HECO pay CSP developers up to 60% more than it pays PV developers for the same power. Even a modest size CSP facility will cost Hawaii 10’s of millions of dollars more in tax credits and electricity purchases. CSP (also known as Solar Thermal) is the most expensive of all energy options, as shown in the figure below. Choosing an obvious and unnecessary waste of money.


PV wins the Solar Technology Battle: Government and industry analysts say that CSP (also known as “solar thermal” technology) is losing the solar energy cost battle and is doomed (1,2.) The project developers are cancelling numerous CSP projects or converting them to PV (3.)

Hawaii’s Experience with CSP is even worse
. Hawaii’s first CSP facility cost approximately $20 million dollars to build and has a capacity of 100 kW (4,5,6.) The cost to build that CSP facility is approximately $200/watt while PV is less than $7/watt. Actual electrical output from the facility has not been made public.


Outrageous cost!
HECO buys renewable energy produced by geothermal, wind, PV, and biomass local suppliers at 12 to 22 cents per KWh. With the proposed CSP rate, HECO will be forced to buy solar energy at 31.6 cents per KWh. Such discriminatory favoritism is unjustified and insulting to electric power customers. For reference, the average price of electricity sold to mainland households is 11 cents per KWh. HECO’s rate is approximately three (3) times higher.
Bottom Line: Hawaii should not subsidize an expensive and unproven CSP technology when proven and less expensive PV options readily exist.

Call to Action:
The Governor and the PUC are preparing to approve a “highway robbery” deal with Sopogy for a multi-million dollar CSP deployment at Kalaeloa on Oahu. This deployment must not be approved. Call the Governor and the PUC and ask them to step away from this very costly proposal.


Note: Sent to Governor, Lt. Governor, the Public Utilities Commission and all Hawaii Legislators on Sept. 13, 2011.

Tuesday, September 13, 2011

Internet in China. Not Much is Accessible.

I spent nearly two weeks in five cities in China, Shanghai, Nanjing, Harbin, Chanchung and Beijing in August. It was a great tour of China's developing might and physical beauty which I describe elsewhere. One of the low spots was Internet access. Here is a pictorial testament of my experience.
No access to Blogger, Facebook, YouTube, Twitter, Vimeo ...

Monday, September 12, 2011

Taxis Are Flexible and High Tech Public Transportation

Cities rely on taxis to serve business people, tourists, the handicapped, the auto-less and people who cannot drive, and all those with urgent and important trips. In Honolulu for example, about one fifth of a taxi's night customers are restaurant, bar and medical facility workers many of whom can't afford high parking fees or do not drive -- given that bus routes shut down by 8 or 9 pm.

Throughout the world, taxis are common carriers, which means that they serve everyone without preference or discrimination. They typically provide 24x7 service, and improve public safety by transporting intoxicated drivers home. Taxis provide essential intermodal connections at airports, harbors, rail and mass transit stations.


The taxi is a privately owned and operated public transportation service.
As an industry, taxis provide thousands of jobs in an urban area for drivers, dispatchers, managers and other vehicle-related jobs. A typical taxi “clocks” approximately 32,500 miles per year in Honolulu and close to 47,000 miles in New York City: A taxi vehicle is used roughly three times more than the average private vehicle in Honolulu and NYC. This in turn generates more business for others: Gas stations, service stations, car repair shops and auto sellers. And lots of fees and taxes paid to government at all levels.

The taxi industry tends to be heavily regulated which may be tolerable during positive economic times but is burdensome during economic downturns and fuel crises. The cyclically revised tariffs per mile and minute do not take into account fluctuations either in the prices of vehicles and fuels or in the value of time. Other disadvantages of the taxi industry are the constant exposure to traffic congestion and traffic accident risk.

Managing a fleet of hundreds of taxis over thousands of miles of a large city network is a daunting task. Done wrong, there can be tremendous waste of driver time and fuel on empty hauls, or long waits at the wrong location. This is where Intelligent Transportation Systems (ITS) come in with the combination of computerized optimization, automated vehicle location (AVL), global positioning systems (GPS), and fast mobile network based communications between fleet and dispatch center. Fuel savings and more revenue trips per shift pay for the technology and improve the taxi operator’s bottom line.

With an integrated system, the right customer is paired with the right available taxi within seconds resulting in superior customer service and minimized down times and wasted fuel. On the aggregate, thousands of taxis (e.g., Honolulu has nearly 2,000) conducting optimal trips can save a lot of congestion and emissions for the whole city.

Mentor Engineering of Canada recently installed its IntelliFleet ITS system for taxis to Honolulu’s oldest taxi company Charley’s Taxi which manages over 200 cabs on Oahu. While Oahu has several ITS components, they tend to operate in bits-and-pieces by city or state departments. The Charley’s Taxi/Mentor Engineering/Sprint/Verizon system is a fully integrated one with additional features for safety and convenience of both the driver and the passengers. A news story by Hawaii News Now can be seen here.



Taxi is arguably the best mode for urban transportation and this is evidenced by its worldwide success. It is car-based so it is fast, convenient, private, clean, and provides door-to-door service. The customer is free to be productive during the trip, and at the end of the trip there is no need to look for and pay for parking.

Indeed, taxi is one of the most basic modes of urban transportation which along with taxis include car, car-pool or van-pool, bus, walk, bicycle, moped or motorcycle, and telecommuting. Some cities have express bus service or bus rapid transit (BRT), light or heavy rail, jitneys, ferries, funiculars and other specialized modes. Taxi service is public transportation and is an essential mode of metropolitan transportation throughout the world.

Could taxis solve the Ewa plains to town congestion problem on Oahu? This is only a half-serious question, but given how government wastes money, it’s worth looking into. Federal and local government wasted $6 Million on TheBoat. It carried roughly 300 people per day for about two (2) years. The same subsidy to 100 taxis would have carried the same people for 6.5 years!

Thursday, September 1, 2011

Ten Reasons Why Nuclear Energy Is Necessary For Another 50-Years

Today I attended an interesting presentation on the merits of ocean thermal energy conversion (OTEC) and fusion with heavy ions (HIF). Fusion is the “miracle” no-radiation, no noxious waste energy concept that for the past 50 years it’s been “20-years in the future.” There are no fusion power plants in existence, in part because of the giant size they require, and the giant budget that comes with it: $50 Billion for one installation which, in turn, would be enough to supply all of California with fuels and electricity. But $50 Billion for the first-of-its-kind installation is a proposition that no private company or politician has put forth.

What we have available today is the much more scalable and affordable fission process of nuclear reactors. So I summarized below ten key reasons why nuclear energy is necessary for areas that anticipate growth in one million people increments. Many cities in Asia and Africa fit this growth profile.

1) Growth: World population was 3 Billion in 1960, 6 Billion in 1999 and expected to be 9 Billion in 2046. Population growth and improving standard of living globally demand increasing amounts of energy. Energy production must roughly double in the next 30 years to accommodate demand.

2) Fossil fuel depletion: Fossil fuels are being depleted, are not renewable and carbon taxes or pollution limits incentivize low carbon power production alternatives, one of which is nuclear.

3) Plant aging: The post WWII rapid growth of 1st world countries was facilitated in large part by electric power plants of various types and sizes. Many of them are past 50 years of age and need replacement.

4) China alone is growing very fast and a major bottleneck of its growth may become the supply of electric power. Mopeds are electric in its large cities and BYD and CODA are selling full-featured electric vehicles.*

5) Uranium as a fuel has advantages: It is relatively abundant, it does not cost much, not a lot of it is needed to fuel nuclear reactors, and supply comes from stable countries such as Australia and Canada. It is only mildly radioactive and its alpha radiation does not penetrate the skin. Uranium metal is commonly handled with gloves as a sufficient precaution.

6) Modern nuclear power plants provide large amount of power, typically over 1 GW which is 1,000 megawatts. One 1.5 GW plant can cover the needs of a 1st world city of about one million population. Its impact on land and other earth resources is very small compared to many other clean energy sources such as photovoltaic and wind.

7) Familiarity: By 2010 there were 440 nuclear power plants in 31 countries supplying about 15% of the world electric power. Also, there are hundreds of naval vessels with compact nuclear reactors.

8) Vinod Koshla told The Economist that Earth is on an unsustainable energy trajectory and the development of affordable new energy is essential for the billions of peoples on the planet and particularly in fast growing China, India, Indonesia and Nigeria.** Until a feasible and affordable breakthrough is achieved in the energy field, nuclear energy is a major option for large populations because of its cost per MW, safety and near zero carbon footprint.

9) Normal safety: Current nuclear plant designs have many more safety features than the 1950s-era power plants that exhibited critical problems in Pennsylvania, Russia and Japan. Here is an example of a late 1980s nuclear reactor that shut down recently because it auto-detected some equipment failure.

10) Catastrophe scenario: The Fukushima, Japan Daiischi nuclear power plant failure is a great example of resilience. Whereas nature’s force and infrastructure failures in the 9 R earthquake on March 11, 2011 (Tōhoku earthquake) claimed over 30,000 lives, this major nuclear power plant accident had no fatalities. The plant designed with 1950s technology and built for an 8 R earthquake actually withstood an earthquake that was 10 times stronger. Flood water from the powerful tsunami jumped over the 25 ft. protective sea-walls and drowned the external diesel generators used to circulate water and cool the reactors. Because of the surrounding catastrophe, nobody was able to fix this external power system. After the 8-hour backup batteries ran out, cooling stopped and partial meltdown commenced. The September 1, 2011 press release of TEPCO Power Company reads in part: “By bringing the reactors and spent fuel pools to a stable cooling condition and mitigating the release of radioactive materials, we will make every effort to enable evacuees to return to their homes and for all citizens to be able to secure a sound life.”

Power is the key ingredient for prosperity. Without adequate and affordable power, our life-style, health and well-being cannot be maintained. Power fundamentally affects our basic needs such as water distribution, sanitation, food production and transportation for covering essential needs. Once it is understood that every 750,000 population requires approximately 1,000 MW per day, the production of affordable energy by existing solar and wind technologies appears only on the lists of severely math (and reality) incompetent individuals.

Unfortunately “environmentalists” and self-appointed “public protectors” are most effective in blocking nuclear power plants for communities with the best engineering, strict safety standards and political stability (e.g., Germany, Japan and U.S. locales.) At the same time, gigawatts of nuclear power are shifting to less secure environs, such as developing ex-soviet and ex-communist countries. This may be an unwelcome transfer of risk for the planet as a whole.

Notes
(*) China is one of a few nations with no apparent hesitation for the deployment of nuclear energy. I show a sample collage below. The approximately 10 million population city of Harbin in northern China has two large nuclear reactors as part of the cityscape. They were within a 30 minute walk from my hotel where I took the picture shown below in late August 2011. A week earlier I was sitting on the left side of the bus from Nanjing to Shanghai, a 160 mile trip. I saw and photographed three large nuclear power plants shown at the bottom of the picture; one every 50 miles!

(**) Add the U.S. (~500 million) and the Philippines (~200 million) to those four and their combined population projection for 2100 reaches 4 Billion!


Thursday, August 25, 2011

Another Prediction for What's in Store with Honolulu's Rail

I am optimistic about the outcome of the lawsuit against Honolulu Rail in federal court. There was no such suit against the Silver Line addition to the Washington DC Metro. So the line is now under construction. These two excerpts from a recent article in New Geography are important:

  • While rail might seem like the most obvious solution, it is also by far the most expensive and slowest option. The price tag is staggering, and the rail extension will take years to construct. The better option would have been to make use of the existing roadways, and implement an expansive bus rapid transit system (BRT).
  • The 23 mile extension of the Washington Metro rapid transit system is forecast to cost $6.8 billion dollars; roughly $296 million per mile. The constant scramble to finance the over-budget project has resulted in more than one construction setback.

What's important is that this system is about the same length as Honolulu's, and it is heavy rail like Honolulu's. So despite the fact that its construction is relatively easy (in the middle of an existing toll road) compared to the nightmare of shoehorning elevated stations and guideways in densely populated Honolulu the cost is staggering and it will likely surpass $7 Billion.

Remember that the financial analysis report conducted for Governor Lingle said that the likely cost of Honolulu Rail will be $7.2 Billion.

So when mayor candidate Carlisle promised that he will "get Honolulu's financial house in order" what did he mean? The answer is clear: "Adding several Billions of new debt onto Honolulu's financial house."

I strongly suggest that you read the rest of the article linked above as it presents a most suitable solution for the Dulles connection and for Honolulu: Bus Rapid Transit on HOT lanes. Much better results are a much lower cost.

Wednesday, August 10, 2011

A $6 Billion Plan for Hawaii's Long-term Prosperity

Dr. Martin Wachs recently wrote an important article on public investment for transportation and jobs. (See blog post below.) He observed that Democrats and Republicans, liberals and conservatives, rural and urban elected officials—all seek funding for roads and transit projects in their districts, asserting repeatedly that these expenditures will create jobs. He correctly asserts that construction jobs do not inherently have higher economic impact than other new jobs. Construction may generate construction jobs but it also is a huge cost item in and of itself and puts a lot of stress on city and state budgets. (All states except North Dacota have deficits.) Finally Wachs says that a shovel-ready project in no way assures that it will have long-term net economic benefits.

Given Wachs’ sound, detailed and impartial assessment, you now can make your own decision between Plan A and Plan B for Honolulu, Hawaii.

For about six billion dollars you can choose either A or B defined as follows.

Plan A
  • Mufi Hannemann's 20 mile, 21 station elevated heavy rail with 3 park-and-ride facilities and no power plant. All of it is a taxpayer subsidized project.
Plan B
  • 11 miles of reversible HOT lanes that will improve the Central Oahu-to-town tidal traffic problem by over 30%.
  • 3 Superferry vessels to connect our islands and provide a resiliency backbone when an island is hit by a disaster.
  • A small Hawaii-based international airline with round-trips to Beijing, Shanghai, Osaka, Moscow, Dubai, Singapore, Sao Paolo and Frankfurt, e.g., Aloha Worldwide.
  • A coal power-plant that will reduce Oahu's oil dependency by 15%. All these can be done as incentivized private projects, or public-private partnerships.
Which plan is best for Hawaii's long term economic prosperity and which one is best for short term political pork?

You know that the correct answer is Plan B. Why are about 75% of Hawaii's politicians choosing Plan A? Because they care about themselves, because doing the same thing again and again is less work, and because they are told what to do by special interests (their party, big money supporters, and unions.)

Tuesday, August 9, 2011

UCLA/RAND Expert on Transportation, Jobs and Economic Growth

Dr. Martin Wachs [1] recently wrote important article on public investment in transportation, and jobs. It dispels the sweet sounding myths promoted by politicians, contractors and unions. The full article can be found here [2]. Key excerpts are given below.

Democrats and Republicans, liberals and conservatives, rural and urban elected officials—all seek funding for roads and transit projects in their districts, asserting repeatedly that these expenditures will create jobs. President Obama vigorously sought to create jobs through transportation spending in the recent economic stimulus package. This seemed familiar: in 1991, when signing the historic Intermodal Surface Transportation Efficiency Act (ISTEA), President George H.W. Bush stated that the value of the bill “is summed up by three words: jobs, jobs, jobs.”

Transportation projects are not all equally effective at creating jobs or stimulating economic growth. Sound transportation investments lower the costs of moving people and goods. Short-term job creation, while vitally important to economic recovery, should not cause us to ignore the longer-term view.

Transportation dollars should be spent on programs that most enhance long-term economic productivity. ... For example, building an ill-advised rail line might give a local economy a short-term boost in employment, only to saddle taxpayers with large operating deficits in the future.

Building the Interstate Highway System created many construction jobs, but it would be a huge mistake to interpret that employment as the system’s contribution to the economy. Workers who drew salaries from the construction program benefitted, but far less than the travelers and shippers of goods who have used those facilities every day for six decades.

By building an effective transportation network, government transportation spending draws jobs to those industries that benefit from the investment. At the same time, this moves jobs away from activities that would have been financed in the absence of the transportation investment. So while transportation investment can “create jobs,” it can also destroy them.

Public officials often mention that each billion dollars of transportation infrastructure investment will create over 30,000 new jobs. This estimate relies on what is called the “multiplier effect.” Construction workers spend their income to buy hamburgers, television sets, and automobile insurance, so a given dollar of construction expenditure ends up having more than a dollar’s worth of impact, thus “multiplying” the effect of the expenditure. Unfortunately, asserting that any expenditure will create a specific number of jobs is not well supported by evidence. Actually, in the short term, construction jobs and expenditures on steel and concrete are economic costs [that weigh heavily on the budget.]

To create or preserve jobs in the short term, it might be more effective to use federal dollars to subsidize the operations and maintenance of transportation systems. Dollars spent on operating bus lines, for example, are spent largely on labor and thus quickly recirculate in the local economy. By contrast, dollars spent on capital or construction projects may include costly expenditures on concrete and steel imported from outside the US. Construction jobs do not inherently have higher multipliers than jobs driving buses.

Identifying a project as shovel-ready in no way assures that it will produce long-term net economic benefits. Simply equating any transportation investment with jobs and gains for the economy cannot remain a sound basis for public policy. America needs to do a better job of systematically evaluating alternative investments.

One way to judge a public investment is to determine whether or not it generates a rate of return to society that exceeds the return earned on other investments in the private or public sectors.

NOTES

[1] Martin Wachs is Professor Emeritus of Civil and Environmental Engineering and City and Regional Planning at the University of California, Berkeley, and former Director of the Institute of Transportation Studies and of the University of California Transportation Center. He is also former Chair of the Department of Urban Planning at UCLA. He is currently a Senior Research Associate at the RAND Corporation (wachs@rand.org).

[2] TRANSPORTATION, JOBS, AND ECONOMIC GROWTH, Access, No. 38, University of California, 2011


Monday, August 8, 2011

Hawaii Energy Cost: Double U.S. Average and Likely to Stay There

Another disadvantageous first for Hawaii, and most of it due to our price of electricity.* We are hooked on oil and the future does not bode well for us because actually it may be cheaper to stay with oil.

Notably crude oil pricing today is at $80. Oil prices may decline further to around $50/barrel (in year 2000 constant dollars) for more than a decade because:
  1. China, India and Germany are focusing on coal. Brazil on ethanol.
  2. The success of fracking and other unconventional methods for extracting natural gas (see below.)
  3. The expected reduction in the political turmoil of oil producing countries.
  4. The localized success of electric vehicles and the continues improvements in vehicle MPG.
  5. The modest introduction of additional large nuclear plants, wind and solar installations.

There is great attention focused on natural gas, worldwide. According to The Economist, August 9, 2011 existing and potential assets (in parentheses) of natural gas for a half dozen countries are as follows, in trillion cubic meters. These are truly vast energy deposits:

  • Argentina 0.4 (21.9)
  • Australia 3.1 (11.2)
  • Canada 1.8 (11.0)
  • China 3.0 (36.1)
  • Poland 0.2 (5.3)
  • USA 7.7 (24.4)

As a result of all these, the likelihood of large price drops in the development of renewable technology is less rosy. This is a major loss for Hawaii which is too tiny to absorb the costs of developing technology.

(*) ENERGY COST INDEX 2011: RANKING THE STATES, August 2011.

Data Sources for the chart with data from SBEC: Gas price index from gas prices provided by the AAA’s website www.fuelgaugereport.com accessed on July 22, 2011, and electricity cost index is an index of state’s average revenue per kilowatt-hour for electricity utilities (data for 2011 through April from the U.S. Energy Information Administration).

Friday, August 5, 2011

It's August 6 in Hiroshima, and 1945 in Detroit.

Image 1: Man-made devastation (1945) ...
Image 2: ... and spectacular recovery (2010) in Hiroshima, Japan.
Image 3: One hopes the same for Detroit and other decimated American cities.
But the happenings in Washington, D.C. give no such hope.







Monday, August 1, 2011

Trains Helped Kill the Greek Economy – They’ll Kill Hawaii’s too

“Some years back a Greek finance minister, fed up with his country's waste and extravagance claimed that he could save money by shutting down the national railway and driving around its passengers in taxis.” [1]

Too bad he didn't execute his plan for the closure of the railways. In 2009 the Greek railways collected $250 million in fares and posted a net loss of $1.4 Billion. A Billion wasted here, and a Billion wasted there … the rest is history for the Greek economy. Greece is now in a debt crisis.

In 2000 a Greek colleague and I conducted research on Greek railroads and we developed models which predicted that the rail freight service would soon carry nothing [2]. No way, they said. Four years later the freight operations of Greek shut down for good. Unfortunately, investment on Obama-like medium-speed rail passenger service continued unabated in Greece. So the budget hole got even bigger.

The lesson here is that public investment in non-performing infrastructure will eventually swamp the budget and saddle current and future generations with a heavy debt burden. Non-performing is any infrastructure in constant need of subsidy whose contribution to the economy is less than its true cost. Roads cost a lot, but contribute much more to the economy, health and safety of the population. Trains cost even more, but offer much much less.

What do you think the future holds for our tiny island that "wants" a five to seven Billion dollar train?

What do you think the future holds for the car-dependent, and highway and airport vested state of California which still plans for a $35 Billion “high speed rail”? A lot of good answers can be found in the article: High Speed Rail and Social Equity. Basically, the only high speed rail that makes sense (and money) is the 340-mile Shinkansen. All the rest, including California's, are A Fast Track to Nowhere.

The lessons about trains "modern" trains can be summarized by three common sense idioms, as follows.

You can’t teach an old dog new tricks. Trains went obsolete for a reason. You can’t solve 21st century mobility problems with 19th century technology. There are always a few exceptions, but Greece, California and Hawaii trains have nothing exceptional.

Those who refuse to do arithmetic are doomed to talk nonsense. One can write a book on this but I will mention only three rail related “math” of Honolulu mayor Peter Carlisle: (1) Get Honolulu’s financial house in order ... by spending over five billion on rail, (2) HART will cost us nothing, and (3) The Ansaldo contract will save Honolulu tens of millions in rail costs. All of them pure nonsense.

They are taking Honolulu for a (train) ride. Biased politicians, biased government officials and their paid consultants deceive the public in order to get elected, become chief of a new division and make millions, respectively.


[1] The Economist, July 2, 2011, p.8.
[2] Paravantis, John A. and Panos D. Prevedouros, Railroads in Greece: History, Characteristics and Forecasts. Transportation Research Record, No. 1742: 34-44, 2001.

Friday, July 29, 2011

Honolulu Rail in Illegal Pact with Local Unions

UCLA Urban Planning Professor Brian Taylor sent me this brief but informative article about California's proposed High Speed Rail: High Speed Rail and Social Equity.

It contains a lot of interesting points and many of them such as construction cost, jobs, "green" transportation and equity apply to Honolulu's proposed heavy rail. However, one passage caught my attention:

"Since the federal regulations currently applicable to transportation infrastructure construction prohibit local hiring preferences, it is unlikely that there will be many jobs for low income people and people of color." No jobs for locals and Hawaiians?

True! The Code of Federal Regulations 23 CFR. §635.117 part (b) reads as follows: “No procedures or requirement shall be imposed by any State which will operate to discriminate against the employment of labor from any other State, possession or territory of the United States, in the construction of a Federal-aid project.” The rail project is clearly a Federal-aid project.

Contrast the facts above this fact from the recent past: Labor Unions Sign Rail Agreement with Honolulu City Officials. The goals of the RTSA include utilizing local labor for high quality work, on time and on budget. The mayor also stated that the agreement will avoid slowdowns and work stoppages.


This “partnership is a working relationship,” said Mayor Hanneman beside labor union leaders, in a conference room packed with reporters and laborers alike. In attendance were signatories to the agreement including: Ronald Taketa of the Hawaii Carpenters Local 745, Joe O’Donnell of the International Brotherhood of Ironworkers Local 625, Peter Iriarte of the International Union of Bricklayers & Allied Craft Workers Local 1, Vaughn Chong of the International Union of Painters & Allied Craft Workers Local 1791, Peter Gamban of the Operative Plasterers’ & Cement Masons’ International Association Local 630 , and William Mahoe of the Operating Engineers Local 3.

And all of it is illegal!

Wednesday, July 27, 2011

Solar Power Plant on Oahu Does not Pass Muster

A five megawatt facility with solar thermal collectors is planned on DHHL lands. The provider and contractor is a local firm that has a smaller deployment on the Big Island.

The Big Island facility has used millions of taxpayer money in the form of technology credits to provide basically a tiny amount of usable energy, if any. As shown in the list below, depending on the source, the Big Island facility is mentioned as being able to generate 2000 KW (2 MW), 500 KW or 100 KW and to be feeding power to HELCO, the Big Island utility. The watt (W) is a measurement of electric power; KW is kilowatt and is equal to 1,000 watts; MW is megawatt and is equal to one million watts.
  • Source (1) says that the power purchasing agreement started in January 2010 for 2 MW.
  • A description of the same Big Island facility specifies 2 MW for $20 million invested using 1,008 solar concentrating panels on 4 acres of land; see source (2). That's $10 Million per MW which is expensive. It comes to $10 per watt whereas rooftop photovoltaic (PV) panel system costs about $5 per watt (See note 1).
  • The company’s CEO said to me in person —and in source (3) cited below—that the facility produces 500 KW. That's $40 Million per MW which is absurdly expensive because now the cost is $40 per watt.
  • The Nevada based electric generator manufacturer who sold the Green Machines that presently operate on the Big Island facility in question specifies two 50 KW generators. So the 4 acre site has a maximum power generation of just 100 KW; source (4). The CEO of the Big Island facility is quoted saying this: “The delivery and performance of the Green Machines have allowed us to fully utilize our solar field…” This means that indeed all that this facility can do on a sunny day without clouds is 100 KW. Now the cost per MW is clearly in the stratosphere at $200 Million per MW or $200 per watt.
The reduction from all this information is that 1,008 panels and 4 acres are required to produce 0.1 MW which is mostly used internally and none of it is sold to HELCO. Unlike a PV system, this concentrated solar panel system requires a lot of electricity to operate pumps, valves, and sun-tracking motors. This means that the amount of electricity sent to the grid is less than the 100 KW stated above, which further increases the cost per MW.

Oahu's daily needs exceed 1,200 MW. If this technology were to power Oahu it would require 48,000 acres and zero cloud cover over the panels 365 days a year. In addition a very large quantity of water would be needed to cool down the generators.

It appears that this locally developed technology of micro solar collectors (sun tracking troughs) can physically produce a small amount of electric power, but it does so at an exorbitant cost, especially when compared to other environmentally benign renewables such as PV.

Given all these facts, now I have several questions:
  1. Were 1,008 solar troughs, that cost millions of dollars in high technology tax credits, installed for HECO TV commercials, politician photo ops, and investor enrichment?
  2. Does HECO and the PUC have any idea as to what works, what doesn't and at what cost?
  3. How can a solar plant with 1,008 collectors produce 2 MW per day and have zero sales to the utility? My home solar panels produce 0.0016 MWh per day and HECO knows all about it.
  4. Have we legislated mandates that promote unreasonable ratepayer charges? Right now Hawaii power customers pay over 250% more for electricity than the mainland. Why do we develop policies and select options that make this premium go even higher?
  5. One of the five stated purposes of Hawaii's PUC is to "Foster and encourage competition or other alternatives where reasonably feasible in an effort to provide consumers with meaningful choices for services at lower rates that are just and reasonable." Purchasing power from a power generating facility at a cost exceeding 22 cents per KWh is very expensive. Why does the PUC entertain rates higher than 25 cents per KWh specifically for “Concentrating Solar Power” as stated in the Feed-in Tariff (FIT) rates?
  6. This preferential rate for a single technology is twice the baseline FIT rate of 13.8 cents per KWh for other renewable energy technologies. Why?
  7. Such a discriminatory pricing begs another question: Is Hawaii so desperate for a local success story that we waste millions of taxpayer and ratepayer dollars in uncompetitive overpriced technologies?
My questions point to a lack of due diligence or breach of fiduciary duty on the part of the utility industry in Hawaii, its regulators and our legislators. The governor must obtain an understanding of the realities of the renewable energy game in Hawaii. Or perhaps the governor is the problem – I mention it as a possibility, but I suspect that he's never received an unbiased briefing.

Hawaii’s energy arena needs clear metrics and performance based contracting, not fake promises and preferential treatment. Hawaii needs fact-based energy leadership, not rhetoric and commercials!

LINKS CITED: Source (1), Source (2), Source (3), Source (4), Note (1): A Price Point for Rooftop Solar Panels

Tuesday, July 26, 2011

Traffic Accident Investigation on Oahu: Stuck in the 1980s.

Civil Beat's Alia Wong has aired the festering problem of Honolulu Shutting Freeways Longer Than Other Cities which is indicative of Oahu's multilayered traffic mismanagement.

As far back as 1998 I wrote this opinion in the Star Bulletin: It takes too long on Oahu to investigate accidents.

Although the HPD is usually confronted with traffic crashes that are "manini" compared to those on the mainland, where jack-knifed trucks get mangled with several other vehicles, it takes hours instead of minutes to deal with incidents.

An incident on Kalanianaole Highway on Dec. 12 prompted me to write this letter. It was reported that at about 1:30 p.m. a car veered into a moped about half a mile east of Aina Koa Street.

At 2:30 p.m. I joined the queue, which had extended for more than a mile on H-1 freeway. It took 28 minutes to drive 1.5 miles. At the crash site, I saw a smashed moped, a car on the shoulder and at least six police vehicles.

Most streets around Kahala Mall were jammed. Waialae Avenue was gridlocked and the off-ramp was overflowing onto the freeway, creating a hazardous situation. At 4:30 p.m., police were still investigating and the queue on H-1 had reached Kokohead Avenue.

I estimate that this three-hour traffic "management" incident trapped more than 9,000 vehicles and more than 12,000 motorists. It caused more than 6,000 people hours of delay, increased the risk for secondary accidents, and resulted in more than 1,500 gallons of additional fuel consumption.

The mayor and the chief of police must remove the archaic and inefficient procedures for incident management and give our officers the education and training needed to get in step with contemporary national practice.

I am subcommittee chair of the Freeway Operations committee of the U.S. Transportation Research Board and I have assisted Attica Tollway in several operational issues. Some of my work on Freeway Incident Management has been published in professional, refereed venues, as follows:
  • Incident Management Simulation on a Two Freeway Corridor in Honolulu. Proceedings of the 6th ITS World Congress, Toronto, November 1999.
  • Video Incident Detection Tests in Freeway Tunnels. Transportation Research Record, No. 1959: 130-139, 2006.
  • Automated Incident Detection and Automated O-D Generation for Freeways, Panel Session 539 on NEW TECHNOLOGY FOR FREEWAY OPERATIONS, Annual Meeting of TRB, Washington, D.C., 2006.
  • Freeway Incidents – US, UK and Attica Tollway: Characteristics, Available Capacity and Models, Transportation Research Record, No. 2047: 57-65, 2008.
In all these years I have never been consulted by the city or state departments of transportation, or the traffic division of HPD. Apparently, all of them know all there is to know. And the results are obvious.

Tuesday, July 19, 2011

MEGA RAIL IN A MICRO CITY

Article published in New Geography. Also appeared in the Washington Examiner, NCPA, Hawaii Reporter and elsewhere.

An exorbitantly costly rapid transit heavy rail project has been proposed for the small Hawaiian island of Oahu, where the leading metropolis, Honolulu, ranks 53rd in population among U.S. cities, with less than 950,000 people. If the project moves forward it will be the world's only elevated heavy rail in a metro area with a population of under four million.

Nothing about this 20-mile long rail project makes sense, except for its politics and its cronyism. It is projected to cost $5.3 billion according to the financial analysis of the city, or $7.2 billion, according to the state. For comparison, the Blue Line between Los Angeles and Long Beach that opened in 1990 has the same length and would cost roughly $1.5 billion to build now.

Cities worldwide and in the U.S. have shown a clear preference for light rail. The only rapid transit (heavy rail) system built in the US since 1990 is the one in Los Angeles in 1993; another was constructed in San Juan, Puerto Rico in 2004. In the same period, 19 light rail systems were installed.

READ MORE

Thursday, June 16, 2011

Big Projects in Hawaii - Why Are They Stuck?

Big projects are complex. So the question why big projects get stuck can generate enormously complex responses. However, the answer boils down to a simple bottom line: Because they don't make the grade!

There are 10 basic dimensions that account for the reasons that big projects succeed or fail. Each project has its own complex set of technical, legal, institutional and financial requirements but 10 basic reasons cover the fundamental requirements.

A project needs to fulfill a major need (or mitigate a major problem), at a low cost, with a large share of it paid by outsiders, and with minimal environmental impacts and implementation risks. It is also important that a project has a strong local advocacy and a weak opposition, and some political support at all levels. A project has a better chance if it utilizes advance technology or is ahead of its time based on proven engineering (e.g., maglev trains, fiber based structural components, etc.) A sound business plan means that a scenario of reasonable adversity keeps the project's balance sheet solvent and subsidies are kept to a minimum even for government projects.


Table 1 presents the 10 fundamental requirements and theoretical scores using a scale where 5 is best and 1 is worst. As a result, a project that garners 50 points is “excellent” and would likely be built at a breakneck speed. Thirty or more points are needed for a project to be deemed “good,” therefore worthy of serious consideration for implementation. Projects with less than 30 points are deemed to be fair or bad and should be avoided.



There have been many high scoring projects such as the successful establishment of Costco and Wal-Mart in Hawaii in less than 10 years, the H-Power and AES power plants on Oahu, the 10 miles of Tampa’s reversible toll lanes built in less than 7 years for less than $400 Million, and the I-35W bridge replacement in the Twin Cities costing $234 Million (completed 3 months early and is Light Rail-ready,) just to mention a few.

Job creation is not a factor. While privately funded projects typically generate new jobs, several taxpayer funded projects tend to be make-work projects. In addition, the job creation aspect is partly accounted for by the Local Advocacy and Political Push factors.


Table 2 presents a sample of 8 big projects in Hawaii and their scores for the 10 basic requirements based on my ratings. Three local projects made it because they deserved it, two failed because they deserved it, and three big ones are predicted to fail. Other experts may assign different scores but the average scores of a handful of unbiased assessors with knowledge of all facets of a project should yield a reliable overall score for a proposed project.


Both the H-3 freeway and the grand expansion of the Honolulu International Airport (HIA) including its controversial reef runway had major cost and environmental problems, but their superior payoff (by providing needed roadway and runway capacity), sound business plan (by paying for themselves in the long run), and generous federal cost sharing garnered them a good score. They got done and work well.

Similarly the Hawaii Convention Center had a lot going for it. The main issue was its location. Once this was resolved, the project was built expeditiously. Its business plan was and still is weak.


Two recent project failures in Hawaii are unique. Both are water transportation projects, and both were implemented and then failed. Both should never have been started. This is particularly true for TheBoat that never had a credible business plan or solved a problem. It removed the equivalent of 2 to 4 buses from the road at a cost of $32 per commuter trip. The (sometimes nauceous) commuter paid only $2; all the rest was public tax subsidy.

The SuperFerry was a fitting transportation addition in the island state of Hawaii but it needed a super-sized investment in order to succeed; roughly four times what was actually available. It needed three fully debugged vessels with no need for custom docking platforms, and it needed media campaign and political greasing similar to the 2006-2008 pro-rail blitzkriegs. Given these requirements, it is questionable that a marine company can make a profit at the level of investment needed for establishing a competitive service. There have been several attempts since before statehood, all leading to losses and closures.

At least three large projects are currently "on the table" in Hawaii: The city's rail project, B.R.Horton's Hoopili project in Ewa (over 12,000 residential units), and the Big Wind project where wind turbines on Molokai and Lanai will generate 400 MW of electric power to be used on Oahu via submerged cables.

None of these projects make the grade. This does not mean that they will not be built. But it does mean that building them is not a good idea and that the monies should have been better spent on other projects and opportunities. Here is why.

Both Rail and Big Wind fulfill a major need but with archaic or problematic technology. Their project proponents have greased the wheels well and they enjoy strong political support, but both projects are very expensive for what they offer and the cost share by outsiders is small or nil. They have large impacts mostly borne by non-users. Both have strong local advocacy and opposition so that's a wash.

Hoopili and Big Wind have credible business plans but their externalities are not accounted for, e.g., Hoopili and surrounding developments require their own freeway lane to/from town, but none is being built. As a result, over 100,000 existing residents will suffer much worse congestion upon Hoopili’s completion and occupancy (even assuming rail is there.) In addition, both the rail and Hoopili obliterate a large portion of prime agricultural land in central Oahu.


A major externality of rail and Hoopili that is not accounted for in their direct costs is the loss of a major portion of prime agricultural land on Oahu. This is a huge loss for an overpopulated remote island.

The 20 mile rail should be replaced by 11 miles of High Occupancy and Toll (HOT) lanes and point-to-point express buses. Hoopili's 12,000 units should be replaced with 12,000 units in Kalihi and Kakaako. Big Wind should be replaced with geothermal power plants on Maui and Big Island, and coal, solar and biomass on Oahu.

The scores for HOT Lanes and Better Energy are shown in Table 3 below. These are good projects that should get done!


Note 1: Those who desire a better understanding on why big projects get or don’t get done may read articles on Megaprojects by Oxford University professor Bent Flyvbjerg, and Utah University's study on Bootleggers, Baptists and Enterprising Politicians, that is, the alliance of profit-driven interests, groups of uncompensated advocates, and opportunist politicians that form the tripartite support alliances needed for a big project to muddle through the project development process.

Note 2: On June 23rd at the Plaza Club, HVCA and ThinkTech present Big Projects in Hawaii - Why are they stuck? Contact: Jay Fidell, ThinkTech Hawaii, jay@fidell.com, (808) 780-9254 for information.