- Honolulu has a severe traffic congestion problem, not a transit problem
- Honolulu is the most lane deficient medium/large metro area in the U.S.
- Honolulu's bus is good but is becoming increasingly unproductive due to added low density routes
- Voters with a tiny 50.6% "yes" margin approved light rail costing well under $5 Billion, not heavy rail costing well above $5 Billion
- Successful rail systems are networks in multimillion population cities not 20 miles of single line on a corridor of less than 600,000 people
- Proposed rail has an exorbitant cost per mile, per resident and per passenger... 2 to 3 times more than the hugely expensive Washington D.C. metro
- Ridership forecasts are outright ridiculous and of course the majority of the projected riders are current bus riders; also about one fifth of the riders projected for year 2030 have not been born yet
- Due to its huge construction costs, the proposed rail will absorb transportation funds for decades causing accumulated deterioration to the already mediocre roads and bus operations
- For the price of rail and its foreign and environmentally intrusive technology Honolulu can build enough congestion relieving infrastructure to achieve 20-minute commutes for 75% of its population
- 95% of Honolulu electric power comes from fossil fuel and thanks to utopian sun and wind policies dependence on oil for power will stay there for a long time
- Reversible express HOT Lanes is clearly the best solution for Honolulu given the prevailing high Bus and Carpool use rates, and huge AM and PM commuting demand peaks; small trains with a capacity of 300 will do very little to demand peaks and even less off peak
- The path to sustainability for Oahu requires HOT Lanes, Bus Rapid Transit, institutionalized TeleCommuting and expanded Bikeways but none of these are active projects
- Independent macroeconomic analysis has confirmed that the proposed rail has a huge negative surplus (benefits minus costs) over a 40+ year horizon
- Rail is unsustainable as a tax and energy black hole; Oahu has a $40 Billion funding liability and rail is the only discretionary project
- Adding insult to injury, it is so ugly ... (see slide 21)
Monday, December 12, 2011
Honolulu Rail is a White Elephant in the Jungle of Transportation Infrastructure
This slideshow explains why the proposed rail is a white elephant in the jungle of transportation infrastructure. Here is a short list of reasons: