Friday, July 10, 2009

BRT and Undergrounding for Speedy, Upgraded and Prettier Honolulu



Several people sent me the same article from the NY Times today. The article is extolling the virtues of Bus Rapid Transit. Here is a sample send from a friend.

Buses May Aid Climate Battle in Poor Cities, Elizabeth Rosenthal, NYTimes, 7.09.09 [ http://www.nytimes.com/2009/07/10/world/americas/10degrees.html?_r=1&em ]

Bogota removed 7000 small private buses to reduce bus fuel by more than 59 percent. Government owned TransMilenio opened first line in 2001 and now averages 1.6 million trips daily. Versions of BRT concept to be copied by Mexico City, Cape Town, Jakarta and Ahmedabad. TransMilenio BRT system is the only large transportation project approved by UN to generate and sell carbon credits of $100- to $300-million.

Another friend sent me this commentary:

"This seems like a sensible, low cost solution. I find it odd that we lack the political will to commandeer two lanes of Kam Hwy, Farrington, Kalanianaole, Nimitz, Vineyard, Kapiolani, King, Beretania, Kalakaua, and other major arteries.

But that Hizzoner is more than willing to tax us into the dark ages to pay for a heavy rail system that: is not affordable, does not decrease traffic congestion, will ruin Oahu's sight lines, create horrible noise and other impacts, etc.


This is not to mention the no/low-cost mitigation that should be implemented right now such as: shifting operating hours of UH to off peak (10am-8pm), better traffic signal coordination, intelligent flow design, afternoon zipper lane heading west, etc.

But do we do these things? Of course not! Because that would alleviate traffic and the false sense of urgency for the heavy rail system that no one wants. Why look at alternatives like at grade light rail or BRT when the Mayor wants a multi-billion dollar legacy project."

To which I replied with this:

The King-Beretania BRT is really a no brainer and can be installed in less than two years for a speedy connection of UH, Manoa and Moiliili with downtown Honolulu and Chinatown. This link dates back to 2002: http://www.eng.hawaii.edu/~panos/pdp_brt.pdf

Taking two traffic lanes away from other streets would be more problematic... and let's not forget transit stations. It is hard to develop ADA stations on surface given Honolulu's density and property values.

I'd prefer double decking the corridor you describe but underground. Not with tunnels but with cut and cover trenches. This plan can provide speedy mass transit and solve Honolulu's rotting utility problem in one shot. The lower deck will be for light rail or electric buses, water, sewer, gas and electric in neatly arranged and accessible lengthwise compartments.

Then a 100 year slab on top will be used for the surface road and
provides the opportunity to develop a modern arterial street with smart sensors and traffic signals. An added bonus is that all overhead wires can be neatly undergrounded. This is not only a permanent improvement in aesthetics but improves infrastructure resilience in case of a hurricane or major storm along the corridor.

In this way, we can bring a whole corridor of Honolulu to 21st century standard in one shot. I believe that this is a worthwhile expenditure of $10 to 15 billion over 20 years, instead of spending the same amount for piecemeal, ineffective, less durable and ugly components.

Thursday, July 9, 2009

2nd International Symposium on Freeway and Tollway Operations


The 2nd ISFO brought together freeway and tollway operators, practitioners and researchers specializing in freeway operations, highway toll operations and corridor management to:
  • Capture the state of the practice in freeway and tollway operations including current programs and planned initiatives for active traffic management.
  • Assess costs and benefits of active traffic management.
  • Discuss Intelligent Transportation Systems, managed lanes, and active traffic management.
  • Explore the potential benefits of using managed lanes, tolling, pricing, and other strategies to improve traffic operations on congested freeways.
  • Present methods and challenges for infrastructure financing and development.
The symposium included a graduate student competition, the results of which can be found here: http://2isfo.eng.hawaii.edu/student.html

Nearly 250 participants had the opportunity to attend 150 presentations in 35 sessions. A number of articles are being prepared to summarize the state-of-the-art in traffic management and lessors learned from the 2nd ISFO. Meanwhile, the links below presents some of the flavors from the intense three days on June 2009:

Freeway Symposium Comes to Honolulu
http://www.youtube.com/watch?v=3MBu-DgX6ek&eurl=http%3A%2F%2F

Lieutenant Governor Duke Aiona Opens 2nd ISFO
http://www.hawaii247.org/2009/07/01/finding-solutions-to-transportation-challenges/

Hawaii Highway Users Alliance Luncheon during the 2nd ISFO
http://www.youtube.com/watch?v=es94aw9x86M&eurl=http%3A%2F%2F

Tuesday, July 7, 2009

Honolulu's Congestion Level Makes Weak Case for Rail

The just published Transportation Statistics Annual Report 2008 indicates that Honolulu's congestion is low among 85 metropolitan areas in the U.S. -- Honolulu is ranked 52nd.

The average delay due to road traffic congestion for travelers in Honolulu is 24 hours per year. This is a large number of wasted hours but it pales in comparison to Los Angeles metropolitan area where the annual loss per traveler is 72 hours. Atlanta, San Francisco and Washington DC tie at 60 hours per year.

These statistics were just released by the Bureau of Transportation Statistics, a unit of the U.S. Department of Transportation. The full report can be found here: http://www.bts.gov/publications/transportation_statistics_annual_report/2008/pdf/entire.pdf

Honolulu's traffic delay peers are Omaha, NE, Sarasota and Pensacola, FL, El Paso, TX, Grand Rapids, MI, and Cape Coral, FL none of which have any form or rail.

Metropolitan areas are classified as very large, large, medium and small. Honolulu is classified as a medium metropolitan area and has 30 peers. Even among its peers, Honolulu ranks lower in delay having 24 hours of annual delay per traveler whereas the average for 30 medium areas was 28 in 2005. See table below.

Very few cities in this group have any form of rail. For example Charlotte has a small new at grade light rail system and its congestion level at 45 hours per year is nearly twice that of Honolulu's. Charlotte's light rail cost was in the order of one billion dollars for a population of over three million people and Honolulu's light rail cost is in the order of five billion dollars for 900,000 (and dropping) population.

These numbers provide a strong indication that on a national priority list for funding "new starts" rail systems, Honolulu's proposal should receive a very low priority for federal funding.


Average Hours of Annual Delay per Traveler
Medium Urban Area 1982 1995 2004 2005
Akron, OH 2 9 11 10
Albany-Schenectady, NY 3 8 16 16
Albuquerque, NM 11 30 30 33
Allentown-Bethlehem, PA-NJ 9 21 22 22
Austin, TX 12 32 44 49
Birmingham, AL 8 21 33 33
Bridgeport-Stamford, CT-NY 9 28 31
Charlotte, NC-SC 12 23 47 45
Dayton, OH 10 22 19 17
El Paso, TX-NM 3 10 22 24
Fresno, CA 12 17 19 20
Grand Rapids, MI 6 19 24 24
Hartford, CT 4 13 19 19
Honolulu, HI 14 26 22 24
Jacksonville, FL 16 40 41 39
Louisville, KY-IN 18 34 44 42
Memphis, TN-MS-AR 6 23 29 30
Nashville-Davidson, TN 20 35 40 40
New Haven, CT 5 13 18 19
Omaha, NE-IA 5 19 26 25
Oxnard-Ventura, CA 4 21 35 39
Raleigh-Durham, NC 8 26 35 35
Richmond, VA 6 22 20 20
Rochester, NY 3 7 10 10
Salt Lake City, UT 8 32 29 27
Sarasota-Bradenton, FL 15 19 26 25
Springfield, MA-CT 7 10 10 11
Toledo, OH-MI 2 12 17 15
Tucson, AZ 24 23 39 42
Tulsa, OK 8 14 19 19
Medium Area Average 9 21 27 28