Wednesday, October 13, 2010
National Performance Metrics Comparison of Honolulu’s Elevated Rail and HOT Lane Proposals. Goal 1 of 3: Economic Growth
In order to reach a bottom line, the best alternative for each goal will receive a score of 10 and the second best will receive a relative score between 0 and 10.
Note that these metrics address deeper goals and treat congestion as an outcome. For congestion relief alone HOT lanes would score a 10 and rail a 1.
In this part we focus on NTPP goal 1 which is Economic Growth. This goal has four metrics but two of them relate to long-distance commerce and travel; they apply to Hawaii when maritime or air transportation is considered.
Brief System Descriptions
RAIL: Fully elevated heavy rail starting about a mile east of Kapolei in the middle of prime agricultural land (presently Aloun and other farms) and ending inside Ala Moana Center with 21 stations and three or four park and ride facilities accommodating fewer than 5,000 cars. Headways are 3 minutes in peak periods, 6 minutes off peak. Trains have a capacity of 300 people of which two thirds are standees. Double track design with no express trains. The system will recover 0% of the capital costs and only 10%-20% of its O&M costs from fares. Capital cost estimated at $5.4 Billion and annual O&M cost at $70 Million/year.
HOT Lanes: 10 miles of elevated 3-lane reversible expressway designed for High Occupancy and Toll operation where buses and large carpools enter free. Low and solo occupancy vehicles pay a graduated toll (e.g., from $0.50 to $5.00). The toll is “congestion insurance.” Paying the toll guarantees 50 mph travel at all times. Higher tolls are necessary to discourage overloading. The facility has Aloha Stadium as its anchor (mid-point) and has exits at Pearl Harbor, Lagoon Drive and Waiakamilo. It starts at the H-1/H-2 merge and ends in Iwilei. The 2.2 miles from Keehi Interchange to Iwilei is a shovel ready project (signed EIS) as “The Nimitz Viaduct.) The system will recover at least one third of its capital costs and 100% of its O&M costs from tolls. Capital cost estimated at $1.7 Billion and annual O&M cost at $20 Million/year.
Access to Jobs and Labor (metropolitan accessibility)
RAIL: National research has shown that rail’s limited reach does not help the jobless to find jobs and is not helpful for those with multiple jobs; and we have many of the latter on Oahu. Rail is a mode for white collar commuters; this is a relatively small market in Hawaii’s service oriented and dispersed industry. Many workers drop off or pick up children from school before work; rail is no good for them. Combinations of rail and bus and walk for door-to-door travel result in uncompetitive travel times compared to direct bus, carpool or car modes. Rail’s original score of 4 is further reduced by 2 points because rail is incapable of providing transportations for goods and services which are vital for the economy and part of this criterion. Score = 4-2 = 2.
HOT Lanes: Nationally HOT lanes is the solution for rapid transportation and the best way to make express buses competitive with the auto and succeed in getting people “out of their cars.” An express bus from Waikele or Waipio on the HOT lanes would reach downtown in under 20 minutes in the middle of rush hour. These express buses can continue to major destinations in Kalihi, Kakaako, Waikiki, and UH. Also Oahu has among the nation’s highest carpool and vanpool rates. HOT lanes are designed to serve these high occupancy modes. HOT lanes provide fast travel for the provision of services (e.g., an electrician can get from Kapolei to Kalihi in under 30 minutes at 7 AM) and offer congestion relief to parallel routes (e.g., H-1 Freeway) which is used heavily for transporting goods. Score = 10.
Access to Non-work Activities (metropolitan accessibility)
RAIL: A very small portion of the population should be expected to use rail for non-work activities such as groceries, shopping, social visits, school events, soccer practice, night clubbing, out on a date, etc. Rail loses 1 point for being unable to be of any use during an emergency such as freeway closure, flooding, hurricane and tsunami. Score = 6-1 = 5.
HOT Lanes: The Honolulu design is for a reversible configuration which is tailored to serve commuting flows so it only partially improves access to the variety of non-work activities that people engage in. It is tailored however to work well for large events at Aloha Stadium by working in-bound to the stadium before the event starts and out-bound at event’s end for quick evacuation. The HOT lanes can also serve as a reliable emergency-only backbone during an emergency. Score = 10.
Summary
Based on the Economic Growth goal and its two metrics, HOT Lanes score 20 points and Elevated Rail scores 7 points.
Tuesday, October 12, 2010
NTPP Transportation Performance Metrics
“This report presents the findings of an intensive, two year effort to develop multi-stakeholder consensus recommendations for a forward-looking American transportation policy. This report is the product of a bipartisan group of 26 members of diverse expertise and affiliations, addressing many complex and contentious topics.”
The report states that “Without clearly articulated goals, it is not surprising that there has been little accountability for the performance of most federal transportation programs and projects to date. The result has been an emphasis on revenue sharing and process, rather than on results. There is no federal requirement to optimize “returns” on public investments, and current programs are not structured to reward positive outcomes, or even to document them.”
As an actionable item the Project developed specific performance metrics. “The performance metrics, must be fair, transparent, and free of bias toward particular transportation modes or geographic regions. The list below summarizes the performance metrics NTPP recommends for measuring performance.”
Economic Growth
(1) Access to jobs and labor (metropolitan accessibility)
(2) Access to non-work activities (metropolitan accessibility)
Energy and Environment
(1) Petroleum consumption
(2) CO2 emissions
Safety
(1) Fatalities and injuries per capita
(2) Fatalities and injuries per Vehicle Miles Traveled (VMT)
The report provides a lot of details and concludes that “Fundamental reform is needed. The alternative is to allow America’s transportation systems to continue to fall short of meeting the multi-faceted demands increasingly being placed on them—with collective costs to the economy, our quality of life, and the environment that can only grow over time.”
NEXT BLOG: Performance Metrics Comparison of Honolulu’s Heavy Rail and HOT Lane Proposals.
Monday, October 4, 2010
The Triumph of Pork over Purpose [Needs to Be Reversed]
The Triumph of Pork over Purpose was written by David Luberoff of Harvard University's Kennedy School of Government.
Notable highlights of the article include the following.
There is no national purpose driving federal highway and transit funding programs. Instead, a variety of special interests -- from contractors and unions to environmentalists and urbanists -- have come to view the national highway and transit program as an opportunity. [Interestingly most environmentalists and urbanists are strongly against the proposed elevated rail for Honolulu, so the project is politician and union driven.]
Earmarked funding for an increasing number of projects: There were only a handful of earmarks in the 1982 act reauthorizing highway and transit laws, but the 1987 measure contained funding for about 150 specific projects --one of the rationales President Reagan cited in his unsuccessful veto of that law. In contrast, no one blinked an eye when ISTEA earmarked money for more than 500 highway and transit projects or when TEA-21 included more than 1,800 earmarks. [Earmarks is one manifestation of pork over purpose. But there are several other ways to promote pork. For example one can declare carbon emissions an enemy and start throwing money at anything that promises carbon emissions reductions. Then "green" causes a lot of real red. The huge deficits of Spain and California prove this.]
The prospect of significant federal funding drives states and localities to build projects that they never would undertake if they had to fund even a significant portion of the costs themselves. For example, the funding strategy for virtually every major rail transit project built in the last three decades -- from Los Angeles' Red Line to Seattle's current troubled project -- has been predicated on securing significant federal funding for those projects because local officials knew that local voters would never have approved local taxes needed to fully fund those projects. [It's worth repeating that 80% to 90% of the funding for H-1, H-2 and H-3 freeways came from FHWA, but only about 25% of the funding for rail may come from the FTA.]
The pressure for special projects and programs creates a process that is politically compelling but one that also is far from economically efficient. And that means that we're not spending the money we have in ways likely to produce significant positive payoffs by either making the economy more efficient or improving the quality of many people's lives. [This is another spot on statement: Infrastructure is paid by taxes. If the wrong infrastructure is built, then taxes are simply wasted.]
The four highlights above --that are worth about 30 Billion Dollars in Hawaii and over One Trillion Dollars in the U.S. as a whole-- explain why I am motivated to seek high elected office with power over infrastructure decisions.
Tuesday, September 28, 2010
Congestion, Rail, APEC and Hurricane Preparedness: Problems and Solutions
Fix traffic lights, install six underpasses, PPP reversible expressway and express buses, Ewa Beach ferry; intelligent traffic management systems. Read the summary of University of Hawaii Congestion Study for details.
Elevated Heavy Rail Costs Too Much, Does Too Little and Will Be a 20 Year Construction, Eminent Domain and Lawsuit Nightmare for Iwi, Environmental Law Abuses, Agriculture Extinction and Hawaiian Lands Invasion
There is no construction for rail. It is not a legal system to build now; maybe in 2012. Stop the paperwork and the money bleeding now, and move on to real solutions with far smaller cultural, environmental and economic impacts. Assess light transit options such as the Oahu Rail Line that has an over 90% preserved right of way between Waianae and airport.
The 2011 meeting of the Asia-Pacific Economic Cooperation (APEC) will be held in Honolulu -- heads of state, Cabinet ministers, business leaders and other officials will attend summit, Nov. 12-20, 2011, at the Hawaii Convention Center. As many as 10,000 people may attend. Event management is critical.
Management by experts with past experience with large special events is necessary. For example I organized two conferences and helped with the 2004 Olympics, as follows:
- 1st ISFO, Athens, Greece, June 4-7, 2006
- 2nd ISFO, Honolulu, Hawaii, June 21-24, 2009
- Halkias, B., Prevedouros, P., et al. Attica Tollway Management in the Athens 2004 Olympic Games. 12th World Congress on Intelligent Transportation Systems, San Francisco, CA, November 2005.
Emergency Resiliency is Non Existent
It is clear that there is no action plan for clearing roads, restoring electricity and providing medical and other vital services to Oahu neighborhoods after a hurricane hits. There is no preparation for it. For starters:
- Core streets need regular tree trimming and proper handling of poles and utilities.
- Placement of trucks, front loaders, ambulances and power units at key locations is essential.
- Emergency docks and “plugs” for Navy Submarines.
- Public second access for Waianae (tunnel to Kunia.)
Monday, September 27, 2010
Parks, Homeless, Water Mains, Sewers and Trash: Problems and Solutions
Partial privatization and Adopt-a-Park corporate and club programs. Private Moanalua Gardens is in top shape. Fully restore the War Memorial Natatorium. Keep Hanauma Bay in top shape -- both visitor side and nature.
Homeless in Parks and Beaches; Kuhio Park Terrace All Full with Micronesians
Shrink the $30,000 Hawaii Homeless Benefit Package. Repatriate mainland homeless. Receive much more support and accommodations for the Federal PACT with Micronesia. Remove mentally ill homeless from streets, parks and beaches and provide them with proper care. Use decommissioned TheBus for overnight sheltering. No sleeping on public parks, etc.
364 Water Main Breaks per Year
High priority replacement of old mains, especially those in corrosive low lying areas. Our fixing rate needs to accelerate.
Sewers Consent Decree with EPA Will Cost Over $7 Billion If Done by the City
A Public Private Partnership (PPP) for reconstruction, maintenance and operation to infuse private capital, to share risk and to operate sewers like a utility. With PPP, construction costs decrease, quality and timeliness improve. Better management. Bottom line: lower monthly bills and better infrastructure.
Oahu’s Recycling Is a Glorified Sorting and Exportation of Trash. Yard Waste Recycling Is Basically Mulching and Dumping. 20% of Trash Burnt is Flyash.
Re-use tires and glass into pavements. Convert flyash into pozolanic cement. Remanufacture plastics into benches, bump stops and other simple and useful parts. Incentivize a private biomass plant to generate electricity out of the voluminous routine green waste collection by the city.
Tuesday, September 7, 2010
Wednesday, August 25, 2010
Tampa Expressway Spurs Tons of Development
Let me first quickly remind the reader about our Kapiolani Boulevard re-development lesson which I first posted in 2008, and then we will go to the pictorial tour of the 10 mile, $320 Million, 60% elevated on single posts Tampa Expressway.
Does Rail Stimulate Long Term Redevelopment? We do not need rail for development and opportunities to flourish. We need a robust economy, a well-paid populous, low taxes, good quality products and services (tourism, education, local products, etc.), steady and smart leadership, and reliable infrastructure and government operations. Rail is simply a scheme to rob a million people (through taxes) in order to benefit a few hundred insiders and a few thousand workers, most of them temporary.
On to Tampa now... Dr. Martin Stone, Planning Director for the Tampa-Hillsborough County Expressway Authority estimates that about $1 billion in new development at its urban end has occurred since the opening of the Tampa Expressway.
Unlike regular Transit Oriented Development (TOD) which are highly subsidized, no tax incentives were needed for these developments.
2052 Streetscape showing the Grand Central (residential, parking, multiple floors of office and commercial on first floor) development, the Slade (residential and commercial on first floor) development and the Towers of Channelside (residential, parking and commercial on first floor at the far end of photo)
2053 Grand Central and Ventana (3 separate buildings - Madison Street view)
2054 Grand Central and Ventana (3 separate buildings - Kennedy Blvd view)
2055 The Slade on Meridian
2057 The Slade with Grand Central in background
2060 Towers with retail on first floor and Cruise ship parking garage in background
2061 New History Museum (on left) with Towers on right
2062 New History Museum