Highway Funding: Do Roads Pay for Themselves? No Because of "Theft"

Here is a brief analysis by Jack Mallinckrodt,  PhD in Electrical Engineering, Stanford University who made U.S. transportation planning his retirement hobby and has developed a series of well thought out articles at his website www.urbantransport.org:

"
The current intense search for additional sources of highway user revenue is grossly misdirected.

Based on FHWA “Highway Statistics” data for 2004 (typical), “highway user fees”, defined as all tax payments by highway users paid as a “necessary condition of their use of the highway system”, are already yielding revenues of $245 billion/yr (2004).  That’s enough to easily pay the full current annual costs of right-of-way, planning, building, maintaining,  and operating, and financing  the entire U.S. highway system, with a surplus (in business called  a “profit”) of $98 billion/yr.

 The fact that they don’t do so is due entirely to:
  1. An arbitrary (not rational) redefinition of “Highway User Fees” hs that counts only about half of the ACTUAL highway user fees paid, and
  2. State and federal politicized congressional misappropriation of those  surplus revenues, (“Diversions) to earmarked political favorites (street cars, bullet trains etc.) that provide little or no congestion reduction capacity at 90 or more times the net the cost per passenger-mile.
As someone might have said: “We don’t have a revenue problem, we have a revenue distribution problem.”. The revenue distribution process is a leaky sieve. The revered “Highway Trust Fund” initiated long ago as a solution to highway funding, with its latter day revisions has become instead, part of the problem.

No conceivable additional revenue collection mechanism, not increased fuel taxes, not tolling, nor mileage charge system, will resolve this funding gap until we fix the real highway fund leakage problem.  Our first priority must be to fix the highway user fee receipt distribution process. Otherwise we will simply be spinning our wheels faster. There is much more to this story, derived and explained in “Highway User Fee Surplus.”
"

Monday, May 5, 2014

Desalination Works but It's Expensive


A recent large deployment of desalination in San Diego is useful to Hawaii where Oahu and Maui may approach the need for manufactured potable water in the next 20 years or so if population and tourism growth trends continue and appreciable sea water rise continues (e.g., 0.32 cm water rise was noted between 1993 and 2013, which, if remains steady, results in 32 cm or 13 inches mean sea level rise every 100 years.) Recall that as sea water rises it makes larger parts of the aquifer brackish, thus unusable for drinking and irrigation.

The project in San Diego was smartly located right next to a large powerplant which means that a comparable location for Oahu would be next to the Kahe powerplant and Electric Beach.  This is because desalination requires vast amounts of both water and electricity, and pumping requirements can be reduced by taking advantage of the seawater pumped into a pre-existing powerplant.



The deployment in San Diego is currently under construction. It is designed to produce 50 MGD of water, that is 50 million gallons per day. This amount of clean water can supply 112,000 typical single family homes or more than one third of the current s.f. homes on Oahu.  This would be the upper limit of desalination plant that would be needed for Oahu. This plant would require more than 30 MW of electricity which is what the H-Power plant was producing for decades, before its boiler capacity was doubled in mid-2013.

The budgeted price of San Diego's Carlsbad desalination plant?  One billion dollars including a 10-mile distribution pipe, if the project is completed on time and on budget in early 2016.  Come 2020, Oahu may need to start budgeting for such a large project.

Monday, April 7, 2014

U.S. Infrastructure Projects Cost Way More Than They Should, Explained

The Atlantic Cities magazine published a condensed analysis of seven main reasons that explain why U.S infrastructure project cost more than elsewhere. They are:

 1. Davis-Bacon Laws: Passed in 1931, the Davis-Bacon Act mandates that laborers for federal public works projects receive local prevailing wages. (+22%)

2. Project Labor Agreements: In 2009, President Obama signed an executive order mandating that contractors for federal projects exceeding $25 million sign Project Labor Agreements, which guarantee the hiring of union workers. (+13~15%)

3. 'Buy America' Provision: For decades, this provision has discouraged projects from being built with manufactured goods made outside the U.S. Obama strengthened it in the 2009 stimulus package to include projects besides just highways. (+10~500%)*

4. Lengthy Environmental Reviews. (+10~25%)*

5. Transportation Alternatives Program: Everyone can agree that walking trails, complete streets, historic renovations, landscaping, and bike lanes are public goods, but should they be paid for with highway fund money? This is the current policy of the FHWA. (+5~20%)*

6. Administrative Costs: Currently, U.S. transportation revenue is like a boomerang, going from the states to Washington and back. Naturally, this process adds bureaucratic costs. (+10%)*

7. Toll Bans: Although tolls exist along some stretches of interstate, they are generally not permitted by the federal government. This has stripped the government of a key revenue source that could be used for repairs, and for cheaper borrowing. (+10~50%)*

Note: (*) Author's estimates.
SOURCE: 7 Reasons U.S. Infrastructure Projects Cost Way More Than They Should

Friday, March 7, 2014

Ken Orski: A 21st Century Approach to Transportation Funding

As states acquire more familiarity with credit transactions and develop more capacity to pursue public-private partnerships, and as federal budgetary constraints continue, long term financing of new transportation facilities and of multi-year reconstruction programs could become the states’ primary method of expanding and modernizing aging infrastructure. At the same time, states' growing fiscal independence points to a new approach to funding the nation's transportation needs in the 21st century. 

In this prospective new model, routine highway maintenance and system preservation would continue to be funded on a pay-as-you-go basis with current state and local tax revenue as supplemented with federal-aid highway dollars from the Highway Trust Fund . However, capital-intensive multi-year reconstruction programs and new capacity expansion projects ---investments that are beyond the states' fiscal capacity to fund out of current revenue --- would be financed largely through public-private partnerships employing long-term credit and availability payments. 
Provision of credit would remain a shared responsibility of the public and private sectors. Private Activity Bonds, the TIFIA program and State Infrastructure Banks would continue to serve as the main public sources of credit assistance while additional public credit facilities could be created, if need be, to handle a growing backlog of reconstruction needs. Potential candidates include Sen. Mark Warner's National Infrastructure Financing Authority (IFA) and Rep.John Delaney's $50 billion American Infrastructure Fund (AIF). The latter proposal would capitalize the AIF by selling bonds to U.S. companies. In exchange for purchasing the bonds, companies would be able to repatriate a portion of their overseas earnings tax-free. (A somewhat similar approach forms part of Rep.Camp's tax reform proposal).

The Highway Trust Fund--- freed from the obligation to fund new infrastructure and large  reconstruction programs on a cash basis---would be placed on a more stable financial footing, while an ample supply of long-term credit ---both public and private---would reduce the need for contract authority and multi-year transportation authorizations. Meanwhile, states and localities would gain more independence to plan and fund infrastructure improvements on their own terms, free of excessive federal regulatory oversight.
It's a highly plausible answer in our judgment to the nation's search for a long-term solution to the infrastructure funding problem.  

Earlier versions of this commentary were presented at the Transportation Research Board workshop,  "States are leading the charge on transportation revenue initiatives," January 12 2014; at the Conservative Policy Summit of the Heritage Foundation on February 10, 2014; and in a Governing magazine interview dated February 27, 2014.


Kenneth Orski
Editor/Publisher
Innovation NewsBriefs (celebrating our 25th year of publication)

Tuesday, January 7, 2014

AIKEA FOR HONOLULU No. 33 – American History 2000-2016: Early Summary of the Barack Bush* Era in 200 Keywords



  • 9/11, Al-Qaeda, Taliban and IEDs.  Patriot Act, TSA, Homeland Security, drones. WikiLeaks and the Snownden-NSA leaks.
  • Appointed Czars: Bush 33, Obama 38.  Executive orders: Bush 146, Obama 147. (First term only.)
  • TEA Party and Occupy Wall Street. Universal Health Care (Obamacare) and Sequester. Debt ceiling.
  • Bailouts and cash-for-clunkers.  Retro cars: Mini, VW Beetle, PT Cruiser, Chevy SSR, Toyota GT86.
  • Big Presidential lies: “Saddam has WMDs” and “You can keep your plan.”
  • So long Ronald Reagan, Steve Jobs and space shuttle.
  • Gates Foundation. Gay marriage. GMO labeling.
  • Kyoto protocol, and (less) global warming.
  • “Smart Growth” and “Livability” = Pack people in condos and trains. U.N. Agenda 21.
  • I-35W bridge collapse. D grade for Infrastructure. Hurricane Katrina, BP Deepwater Horizon.
  • Green energy black holes: Electric car/Fisker, solar/Solyndra, corn ethanol and wind farm subsidies.
  • Oil at $147/barrel in mid-2008. Frack it! Natural gas to the rescue. Keystone XL pipeline.
  • Infrastructure finance, PPP, open road tolling, road concession, EZPASS, HOT lanes.
  • Google car and Google glass. Toyota Prius, Twitter, and tablets. Nanotechnology, carbon fiber, and composites. 
  • Boom: Android, Bitcoin, e-cigarettes, iMac, iBook, iTunes, iPod, iPhone, iPad, Made in China, Marijuana,  Facebook, Lipitor, Smart Phones, Tesla car, Viagra.
  • Bust: AOL, AltaVista, Pontiac, Plymouth, Lehman Brothers, BlackBerry, HealthCare.gov (?)
Around 2016: The Baby Boom social security and other social net overloading, the large pension underfunding of several states, and ObamaCare direct and indirect costs come to full bloom (and gloom.)

Notable International: The economies of BRICs and PIIGS *** No “Arab Spring,” Egypt, Syria and Benghazi *** ~270,000 dead by 2004 Indian Ocean tsunami *** 2004 Athens Olympics *** 3/11 Tsunami and Fukushima disaster in Japan *** Castro, Chavez, Gaddafi, Kim Jong-Il and Bin Laden gone *** So long Margaret Thatcher, Nelson Mandela and supersonic passenger flight (Concorde) *** Full double-decker 550-850 passenger A380.



Notes (*): The Economist, Barack Hussein Bush, Dec 17th 2008 *** The Wall Street Journal, Barack Hussein Bush, June 5, 2009
PPP = public-private partnership (or P3)
BRIC = Brazil, Russia, India and China
PIIGS = Portugal, Ireland, Italy, Greece and Spain
This summary does not include Entertainment and Sports highlights.

Monday, November 4, 2013

Honolulu Rail: 2005-2013 Slideshow

The slide show presentation titled Fighting ● Boondoggles ● Honolulu ● Rail ● Transit was presented at the 2013 American Dream conference in Washington, D.C. in mid-October 2013.  It provides a brief summary of:
  • Honolulu's history of billion dollar transit plans
  • Why is Honolulu Rail a boondoggle?
  • What was done to stop this train?
Honolulu's $5.2 Billion rail project  is a testament of the power of government and special interests to get their way.  As the Honolulu Civil Beat's multiple polls over the years have revealed, this project never enjoyed a public approval of over 35%.


Wednesday, October 2, 2013

Ten Plus One Reasons Why I Do Not Support The Honolulu Rail Project

  1. Among all travel options on Oahu, mass transit serves 6% of the travelers, just slightly above the U.S average of 5%. Focusing on this small piece of the pie is no way to solve the mobility problem of the 80% that drive and carpool, i.e., rail is the 1% solution because City's rosy numbers show that transit share will grow from 6% now to 7% with rail.
  2. Spending over five billion dollars for a non-solution is clearly unethical and all responsible for it are breaching their professional and fiduciary duty. As an engineering professional and past candidate for mayor I want no part in this unethical endeavor.
  3. The original system was supposed to be 34 miles through Kapolei to UH and Waikiki for about $3 Billion as shown in the headline above.  The current project starts a mile out of Kapolei and dead-ends at Ala Moana shopping center with no service to Waikiki or UH. Just 20 miles for over $5 Billion. If offering the public 41% less for a 73% higher price is not a lie then what is it?
  4. In some respects Oahu's congestion is comparable to that of the largest cities in the nation chiefly because Oahu is lane deficient.  20 miles of rail and 20 overhead stations will cause critical lane closures and result in debilitating congestion for a decade or more. For example, look at the image below and consider what traffic in downtown Honolulu will be like with Ala Moana Boulevard closed for about a year? The impact on quality of life, economy and tourism will be huge.
  5. B, C, E, 3, 9, 11, 20, 43, 53, 73, 81, 90, 91, 92, 93, 94, 96, 97, 98A, 101, 102, 103, 201, 202 are all the bus routes that will be eliminated or terminated to the nearest rail station. TheBus will be changed from a core operation to a feeder operation. This will add a lot of inconvenience and disappointment to the people that need transit service the most.
  6. Rail is high security risk. Mentally ill shooters and terrorists typically attack work, school and train station locations. Third rail systems like Honolulu's are a magnet for suicides. Train stations are a hot spot for robberies and drug trafficking.
  7. Rail makes Honolulu less resilient:It is practically certain that a major storm will hit Oahu in the next 50 years. Ten miles of reversible lanes not only will reduce congestion by over 30% for one third the cost of rail, but also they will be a critical backbone for post-storm recovery. Instead rail will be incapacitated for a prolonged period and critical resources will wasted to revive it.
  8. Cannot afford it. Hawaii is among the five worse states in the country in pension and health benefit funding liability. Future budgets will be very tight for the state. Outer islands should worry about their loss of big subsidies they receive from Oahu (i.e., they too will pay for it.)
  9. The City already has big problems finding a few million dollars for important services. Its budgets will be crushed by the union raises, the EPA sewer consent decree and the pension liabilities. Then add the rail construction cost-overruns and bankruptcy may not be far off.
  10. Out of more than 650,000 adults on Oahu only 156,000 voted YES to rail in the 2008 elections. That yielded a marginal 50.6% approval among those who bothered to vote. During elections the ratio of pro-rail lies to anti-rail information in advertising media was more than 10 to 1. Taxpayer monies were used to support rail and, indirectly, rail-supporting politicians. Calling this a "mandate" is disingenuous and the process was indeed unethical.
Last but not least, the aesthetics of the system are undesirable for the small, tropical capital of Honolulu. Here is just one before/after picture offered in city's renderings.

Monday, September 9, 2013

Ode to the American Freeway

History, Landscape, Beauty on the American Freeway is a brief summary of the many positives of freeways for the U.S. University of Illinois at Chicago professor emeritus of Art history, Architecture and Urban Planning Robert Bruegmann developed a well written piece with great photos as a bonus.  Here are a couple of the opening passages.


"Freeways, particularly urban freeways, have had a bad press for several decades now.  They are accused of despoiling scenery, destroying habitat and causing urban sprawl.  Many observers report with glee on the latest news of a small segment of urban freeway being dismantled.

This blanket condemnation makes it easy to overlook the remarkable contribution that these freeways have made to the American economy and to American culture.  It is hard to imagine the growth in productivity in the country during the postwar years without these roads, which vastly increased the mobility of goods and people and connected parts of the country together in ways that were unprecedented.

The constant criticism also makes it difficult to appreciate these roads as cultural artifacts and a wonderful way to see the country." [Link to the article.]

Remember that free in freeway comes from free-from-interruptions such as stop signs and traffic signals; not free-of-charge for their use.  Whether by gas tax, toll or other taxation, freeways need to be paid for. But keep in mind that:
  • Moving one person one mile on the freeway costs about $1 all inclusive (i.e., cost for the design, construction and maintenance of the freeway plus the vehicle to use on it).
  • Moving one person one mile on transit (all inclusive) costs about $5 (and the calculation assumes that buses use the roads for free.)
  • All goods, delivery and emergency services run on freeways. None of them run on transit.

Wednesday, August 21, 2013

The Next 100 MW Power Plant for Oahu

Gabriel El-Swaify, recent Masters graduate from the Department of Civil Engineering at UH-Manoa, describes his analysis leading to the best choice for "The Next 100 MW Power Plant on Oahu" that he conducted as part of his graduate study. I was the supervisor of this analysis.

Gabriel analyzed both renewable (e.g., wind) and traditional feedstock (e.g., coal) for power plants. He also accounted for land use (land acreage needed for the plant and its accessories) and long term maintenance as well as stand-by power requirements when renewable sources are not available.

Waste-to-energy and Geothermal power plants are among the best choices as explained in this installment of my O'lelo show PANOS 2050: Solutions for a Sustainable Hawaii.

Wednesday, June 12, 2013

Circuit of the Americas: Racing to the Finish

"When in 2010 the city of Austin, Texas, was awarded the United States Grand Prix for 10 years, plans to construct the Formula 1 racetrack there, the Circuit of the Americas, quickly got under way, and an unlikely midsize civil engineering and surveying firm was awarded the civil engineering design contract."

This is a fascinating story of infrastructure development for a top flight world sporting event. Read this open article starting on page 64 of the Civil Engineering Magazine, May 2013 issue, of the American Society of Civil Engineers: Racing to the Finish.

Friday, June 7, 2013

Tesla Is Reinventing the Industrial and Infrastructure Process

Tesla is not only reinventing the car...  They are reinventing applied science, industrial product development and infrastructure planning.

At Toyota "we get a lot of standards and specifications, then we build a prototype and test it. At Tesla they get the standards and specifications set, and then change it on the fly. They spend more time in the validation phase. We spend more time in up-front planning.”

Typically we plan and design infrastructure (e.g., energy and transportation systems) too much. But rarely we go back and validate whether systems really worked as intended...

Unofficial assessments:
  • Did the H-3 Freeway meet its traffic target?  It exceeded it.
  • Did the Kal. Hwy widening relieve Hawaii Kai to Kahala trip times? Travel times were reduced by over ~25%.
Official assessments:
  • Do modern (built after 1995) light and heavy rail systems in any city in the US meet or exceed their planned ridership that justified their construction, after 5 or10 years in operation?
  • Nine out of 10 failed to do this. Several of them spectacularly. The largest US failure (after Tren Urbano in Puerto Rico) will be Honolulu.

Friday, February 22, 2013

Transportation and Economy

This is a 22 minute lecture on the very many facets of Transportation and its effect in the regional, national and world Economy.

It's in the format of a movie for my public access TV show Panos 2050: Sustainable Solutions for Hawaii on Transportation and Economy.

Click the link and wait a few seconds for the movie to load.

Friday, January 11, 2013

Transportation and Energy Infrastructure Projects: Forecasting is Unnecessary

I enjoyed Dr. Martin Wachs' brief article Planning for High Speed Rail (HSR) in California. It centers around planning and forecasting: "The current debate is divisive precisely because improved data and models cannot provide a better glimpse into the future" Wachs says.

After nearly three decades in planning and policy, and six years involvement in local politics I have come to believe that forecasting is unnecessary as a primary decision making tool. Why?

Because transportation infrastructure deployment lags demand by decades. Why do we need to forecast 20+ years into the future? The need is present (or not.) Current data are the best quality data we have. So instead of making numerous uncertain assumptions about a future we do not control, let's assume that the project is built overnight and assess its benefits at the present time.

In the case of Hawaii, when I first relocated here in 1990, traffic congestion was the No. 1 issue and has remained in the top 10 ever since. Twenty three years later, roadway capacity addition has been marginal and most major bottlenecks have not been addressed. So why does the city's planned rail project have a 2030 horizon?

I think the answer is this: The proposed rail does not generate enough ridership with the current population so artificial demand balloons for population and jobs in 2030 are "forecast" to justify the system.

Similarly California has a population of 38 million with huge concentrations in Los Angeles and San Francisco metro areas. If HSR does not work for 38 million, then it won't work. Why is a 20 to 50 year projection needed?

Worse yet, the typical  planning models lack credibility because they are never tested with back-casting.  If Parsons Brinkerhoff's model is trusted to predict transit ridership (bus and rail) in Honolulu with year 2006 as baseline and 2030 as the horizon, does it also predict transit ridership for 1982?  In other words, we should check the model's ability to project forward by using the 24-year period from 1982 to 2006; for which we have perfect information. How does the model do?

I think the answer is this: It does very poorly and for this reason back-casting is never applied.(1)

Obviously, since the inception of a project, several years go by for environmental studies, design,  engineering, funding, bidding and construction. So a 10 years-out plan and forecast is needed. But multi-billion dollar energy and transportation infrastructure projects should be justified by their "now" value and not by future demand balloons.

If the projects are beneficial "now" then long range forecasts can be performed for selecting the proper size for them. For example a reversible highway sized at two lanes for sufficient congestion relief may need to be built with three lanes to accommodate future demand. Similarly a 1,000 MW power plant may be engineered with a 1,200 MW capacity for the future.

Projects funded with private capital, fully or partly as in Public-Private Partnerships, sophisticated risk analyses that protect investment from foreseeable risks are conducted. These meticulous and carefully inspected forecasts of project costs and revenues have little in common with the manipulated forecasts for taxpayer funded and subsidized systems, primarily transit systems.

For taxpayer funded projects forecasting is unnecessary and indeed misleading for decision making. It is commonly used a tool for deception, particularly for rail projects.(2)


Endnotes

(1) My students and I investigated the accuracy of traffic volume forecasts primarily in the agriculture-to-residential mega developments in Ewa between 1976 and 2002. We found this:

The study compared forecast traffic levels from Traffic Impact Analysis Reports prepared between 1976 and 2002 to actual traffic volumes recorded by the Hawaii State DOT in the city and county of Honolulu. The information extracted uniformly from 11 reports included year of report, consultant, type of project, location, movement, forecast horizon, forecast traffic volumes and forecasting method.

This study focused on road and residential developments and examined the accuracy of traffic demand forecasting, the conservative or optimistic tendency in traffic forecasts and the potential factors affecting accuracy. The results revealed that traffic forecasts are on average overestimated by 35% and there is a clear tendency to overestimate future traffic volume. Errors ranged from -40% to +200%.

SOURCE: Caroee, Maja, Panos D. Prevedouros and Alyx Yu, Volume Forecasts for Environmental Impact Statements and Traffic Impact Analysis Reports: Accuracy of Road and Residential Developments in Honolulu, Paper 13-1398, 92nd Annual Meeting of Transportation Research Board, Washington, D.C., 2013.

(2) Flybjerg, Bent, et al., Delusion and Deception in Large Infrastructure Projects (2009)

Monday, December 17, 2012

Green Energy and Rail Get an F

Election politics are behind us so it is a good time to post the economic report card for President Obama's first term issued by The Economist on September 1, 2012.

I am pleased to see that for the two areas of "green energy" and "rail passenger transportation" The Economist gives the President an F. These are indeed the two areas that I completely disagree with both the President, Hawaii's Governor, most of Hawaii's current political establishment, and with the environmentalists of Sierra Club.

Indeed, biased taxpayer black holes deserve this.


It is my hope that this F along with today's sad news of the death of US Senator Inouye along with the retirement of US Senator Akaka (this is a 1-2 knockout punch for Hawaii to the very bottom of US Senate seniority combined with Hawaii's rock bottom seniority in the US House) will infuse sanity and restraint into the brains of local decision makers.

Cuts are painful, but cutting wasteful projects* is productive and necessary to avoid a nosedive.

(*) The rail, transit oriented development, wind farms, limitless solar subsidies, inter-island cable, government solar farms, cookie-cutter housing on prime agricultural land, North Shore mega-developments along a single, jammed 2-lane country road, ...

Monday, November 26, 2012

EPA and Caldwell Are Costing Honolulu $4.5 Billion for Sewers



October 2012 was the 40th anniversary of the landmark Clean Water Act (CWA). On this anniversary, the U.S. Conference of Mayors voiced concerns with what is seen as an increasingly unequal partnership with the federal government. The nation’s towns and cities face a “fiscal crossroads with affordability” as a result of the costs associated with the CWA.
  
Jim Suttle, the mayor of Omaha, Nebraska and former director of its public works department states that the EPA’s reliance on consent decrees is a factor that has impeded the search for innovative solutions to sewer overflows and other problems pertaining to clean water. He argues that the federal government must stop pursuing consent decrees and instead rely on the permitting process to manage water quality problems.

The U.S. Conference of Mayors brings up as an example Lima, Ohio, a town of 39,000 residents. To comply with the Clean Water Act, Lima devised a $60-million long-term control plan, but in 2005 the EPA rejected the plan, and has sought to impose a consent decree that would entail $104 million in capital costs. As a result, Lima’s population will face sewer rates amounting to 4% to 7% of their household income. The CWA compliance costs come to about $2,700 per Lima resident.

Honolulu is in a similar predicament with the overreaching consent decree that Mayor Hannemann signed with the EPA for secondary sewage treatment which is expected to cost no less than $2 billion (The $1.2 billion figure in this article is old and partial.) The same consent decree mandates a number of other replacements and upgrades that will cost about $2.5 billion for an approximate total cost of about $4.5 billion. The CWA compliance costs come to about $4,600 per Oahu resident, almost twice those for Lima residents.

These figures indicate that EPA has gone wild with its requirements for small and large cities. Michael Bissonnette, the mayor of Chicopee, Massachusetts has requested revisiting the consent decrees that are already in place. The U.S. Conference of Mayors is calling on Congress to amend the CWA to make it less burdensome to local governments. The group wants a cap placed on costs to ratepayer associated with unfunded water mandates.

In Honolulu, KITV has already reported that local residents are calling the Board of Water Supply because they can’t afford to pay the rapidly escalating water and sewer rates. (View KITV story.) Therefore, high on the agenda of the new mayor of Honolulu should be the revisiting of the exorbitantly expensive EPA consent decree. This however, would be highly unlikely with mayor-elect Caldwell because he considers this outrageously expensive agreement as an accomplishment.

Thursday, May 17, 2012

BBC: Is it Cheaper to Put Greek Train Passengers in Taxis?

BBC News coverage on May 12, 2012.

The claim that it would be cheaper for Greece to send every rail passenger to their destination by taxi was first made by Stefanos Manos, the former Greek finance minister, in 1992. Manos used the railway system to illustrate what he saw as gross public sector waste.

Mr Manos is correct if there are more than two passengers in each taxi.

But either way, the Greek railways are in a pretty awful mess, and while train journeys may cost less than cab journeys, they are more expensive than travel on other forms of public transport, including air.

"Over $13bn has been pumped in, in the last 15 or 16 years. In terms of passengers, long-distance rail has 2.7% of the share and in terms of freight it's truly a joke because it's 0.08% of the freight so the costs are staggering," says Prof Prevedouros.

Tuesday, May 1, 2012

10 Requirements for Infrastructure Mega-Project Success

This article was published in the Hellenic Institute of Transportation Engineers, SES News No. 179, Feb. 2012.

The article features analysis and a spectacular picture of Gefyra which is a 9,500 ft. long cable-stayed bridge connecting Rio and Antirio. (I was born and raised in the city of Patras which is just five miles from Rio.) The Rio-Antirio Bridge received the 2005 Outstanding Civil Engineering Achievement (OCEA) by the American Society of Civil Engineers (ASCE).

Hawaii and Greece are half a globe apart, but they have several things in common:
  • Both are temperate places dominated by coastline and a marine lifestyle.
  • Both have been historically invaded and taken advantage of by various colonialists.
  • Both are relatively powerless in regional and world politics.
  • Both have agriculture and fisheries, but they are relatively poor in natural resources.
  • In both places tourism, education and military are a big part of the economy. And,
  • Both places have insider-dominated politics.
With these as background let’s look in brief at the lessons learned from large infrastructure proposals for highways, airports, rail systems, and large wind, solar or other renewable energy “farms.”

Tuesday, March 13, 2012

Honolulu’s Money Train

Wendell Cox summarizes the reasons why the proposed Honolulu Rail is such a bad idea for the 99% who are not in it for the money in Honolulu’s Money Train.